in Mr. Fixit

New Year’s Day Projects

I spent a good portion of the holiday break catching up on house projects. First the Christmas tree and all decorations were packed up and placed back into the attic. Then more mulch was added to the side flowerbed. I turned my attention to the hole dug under the air conditioner by the varmit who visited us earlier, getting it patched up better than new. While there was a break in the rain, I realigned a downspout so it drains onto the driveway rather than the yard. This should help the new grass take better hold in that spot.

I also changed out the kitchen light fixture, something that had been bothering us for months. I also hung the flourescent shop light in the garage, providing much light there. I plugged various holes in the cabinets and other dark places with steel wool to seal out the mice. I cleaned under the fireplace and wiped all the soot off the fireplace glass. It looks worlds better now.

One thing I started but didn’t finish is putting another shelf over our washer and dryer. Hammering and drilling isn’t compatible with napping children so it will wait for another day. Part of that involves moving the existing shelf lower to make even more use of space.

On the geek side, I reflashed Linux onto my Linksys NSLU2 device and got it using the 1GB flash drive I added to it. I put Openslug on it since I didn’t need a web interface for it anymore. Instead I got a barely-usable Linux distro with no support for simple things like USB printers. It took a few hours just to get CUPS installed and working with HTTPS. When I found there was no USB printer support in the kernel (or modules) I threw in the towel. I’m not looking forward to having to recompile (and cross-compile, too) the Openslug kernel simply to get printer support, but it looks like that’s what I have to do. Linux on the NSLU2 isn’t just cutting edge, it’s bleeding cutting edge, only suitable for geek sadomasochists.

I’m sure I’m forgetting something in my list of projects but that’ll do for now.